Hello,
I have a question about ply drop. I have received ply drop sequence from stress department to design a simple L Angle with 9 Plies on Lower Flange and 7 Plies on Web.
After satisfying all the sequence rules and everything, there is a possibilities of 4 ways to make the ply drop as shown in the attached figure.
But Which is most preferred design based on Stress and Manufacturing and in general composite design practice and Why?
Thank You.