Just a rant…we’re running these composites parts for an armored vehicle and the only bag we had was stretchlon 200, after I measured off the mould, it would require a 16 foot long bag 60" wide. I thought, this should be fun…
Needless to say the part sounded like a tea kettle when infusing, popping and hissing away. At last count 27 holes, best I could get was 25 merc on the gauge, if it rose above that, pop goes the bag again.
The holes seemed to stop so long as it stayed at 23 merc so I put a regulator on the line and left it at 23. Hoping that will keep till the morning, this was a painful infusion. We got the part to infuse all the way but it took a little extra resin so all I need now is enough vacuum to hold the part and pray for a quick gel time.
Anyone else with one of those days?